ST 9 RUSSELL ST over WATER CONNECTICUT RIVER
250 E JCT DAMON RD. · County 015, Massachusetts · Built 1937 · 4 Lanes · 30,785 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.335953, -72.618233
This bridge is in worse condition than 32.9% of bridges in County 015. The average bridge in Massachusetts is 0 years old; this one is 89 years old.
Nearby Bridges
I 91 NB over ST 9 BRIDGE ST
Built 1965
I 91 SB over ST 9 BRIDGE ST
Built 1965
I 91 NB over OTHER NORWOTTUCK RA TR
Built 1965
I 91 SB over OTHER NORTWOTTUCK RA TR
Built 1965
I 91 SB over HWY OLD FERRY RD
Built 1965
I 91 NB over HWY OLD FERRY RD
Built 1965
I 91 NB over HWY DAMON RD
Built 1965
I 91 SB over HWY DAMON RD
Built 1965
I 91 SB over COMB I 91 RAMP & GWRR
Built 1963
I 91 NB over COMB I 91 RAMP & GWRR
Built 1963
Bridge Details
- Structure #
- H010120UUDOTNBI
- Year Built
- 1937
- Reconstructed
- 2003
- Length
- 439.2 m (1440.9 ft)
- Max Span
- 90.2 m
- Width
- 19 m (62.3 ft)
- Lanes
- 4
- Daily Traffic
- 30,785
- Material
- Other
- Design
- Mixed Types
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $54,274,000
- Total Project Cost
- $81,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.