HWY JACKSON ST over OTHER NORTHAMPTON BK WAY
0.15 M N OF PROSPECT ST · County 015, Massachusetts · Built 1890 · 2 Lanes · 7,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.331825, -72.64505
This bridge is in worse condition than 59.7% of bridges in County 015. The average bridge in Massachusetts is 0 years old; this one is 136 years old.
Nearby Bridges
I 91 SB over COMB I 91 RAMP & GWRR
Built 1963
I 91 SB OFF RAMP over US 5 /ST10/N KING ST
Built 1963
I 91 NB over COMB I 91 RAMP & GWRR
Built 1963
I 91 SB over HWY DAMON RD
Built 1965
I 91 NB over HWY DAMON RD
Built 1965
I 91 SB over OTHER NORTWOTTUCK RA TR
Built 1965
I 91 NB over OTHER NORWOTTUCK RA TR
Built 1965
I 91 SB over ST 9 BRIDGE ST
Built 1965
I 91 NB over ST 9 BRIDGE ST
Built 1965
ST 10 SOUTH ST over OTHER MANHAN RAIL TRAIL
Built 1948
Bridge Details
- Structure #
- N190110MJMUNNBI
- Year Built
- 1890
- Reconstructed
- 1977
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,500
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $515,000
- Total Project Cost
- $773,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.