HWY CENTRAL ST over WATER IPSWICH RIVER

0.15 KM S OF ST-62 · County 017, Massachusetts · Built 1995 · 2 Lanes · 4,970 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
N180047YDMUNNBI
Year Built
1995
Length
12.2 m (40 ft)
Max Span
10.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
4,970
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.