I 295 SB over HWY MT HOPE ST

1.2 MI W OF I 95 · County 005, Massachusetts · Built 1967 · 3 Lanes · 29,071 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
N160563UNDOTNBI
Year Built
1967
Length
47.5 m (155.8 ft)
Max Span
22.6 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
29,071
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,329,000
Total Project Cost
$7,994,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.