I 195 over ST140

1/2MI N OF BUTTONWOOD PK · County 005, Massachusetts · Built 2011 · 8 Lanes · 80,368 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N0601471FDOTNBI
Year Built
2011
Length
50.7 m (166.3 ft)
Max Span
24.3 m
Width
37.9 m (124.3 ft)
Lanes
8
Daily Traffic
80,368
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$56,000
Total Project Cost
$85,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.