HWY STAFFORD HLW over RR NECRR

.2 MI E OF ST 32 · County 013, Massachusetts · Built 1850 · 1 Lanes · 776 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
M270261AHDOT634
Year Built
1850
Reconstructed
1960
Length
7.7 m (25.3 ft)
Max Span
6.4 m
Width
5.9 m (19.4 ft)
Lanes
1
Daily Traffic
776
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,662,000
Total Project Cost
$2,494,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.