HWY TOWN HILL RD over WATER FACTORY BROOK

3.2MI S OF SKYLINE TRAIL · County 015, Massachusetts · Built 1920 · 2 Lanes · 129 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M1900305PMUNNBI
Year Built
1920
Reconstructed
1957
Length
20 m (65.6 ft)
Max Span
16.9 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
129
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$767,000
Total Project Cost
$1,151,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.