HWY CHERRY ST over I 495

.4 M S OF RTE 28 · County 023, Massachusetts · Built 1958 · 2 Lanes · 1,164 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M180434AADOTNBI
Year Built
1958
Reconstructed
1992
Length
72.2 m (236.9 ft)
Max Span
23.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,164
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,972,000
Total Project Cost
$8,959,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.