HWY HARTFORD AVE over WATER MILL RIVER

.1 MI EAST OF NECK HILL R · County 027, Massachusetts · Built 1991 · 2 Lanes · 10,050 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
M150096T9MUNNBI
Year Built
1991
Length
6.1 m (20 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
10,050
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$569,000
Total Project Cost
$854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.