HWY HALL ST over WATER WESTERN CANAL

SOUTH OF MERRIMACK RIV · County 017, Massachusetts · Built 1910 · 2 Lanes · 3,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
L15110CAUMUNNBI
Year Built
1910
Length
8.8 m (28.9 ft)
Max Span
8.8 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,424,000
Total Project Cost
$3,637,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.