HWY CABOT ST over WATER NORTHERN CANAL

N. OF FRENCH ST. EXT. · County 017, Massachusetts · Built 1850 · 2 Lanes · 8,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L150282BLMUNNBI
Year Built
1850
Reconstructed
1949
Length
32.9 m (107.9 ft)
Max Span
10.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
8,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,636,000
Total Project Cost
$3,955,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.