ST 2 A/MAPLE ST over OTHER MINUTEMAN BIKE PTH

.16 KM E RT 2A & MASS AVE · County 017, Massachusetts · Built 1919 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
L100012N1DOT634
Year Built
1919
Reconstructed
1997
Length
16.5 m (54.1 ft)
Max Span
15.4 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
12,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,298,000
Total Project Cost
$1,948,000