HWY LOWELL ST over OTHER MINUTMN BP & BROOK

200 FT SO PARK AVE · County 017, Massachusetts · Built 1937 · 2 Lanes · 4,914 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
A100042MMDOT634
Year Built
1937
Reconstructed
1997
Length
17 m (55.8 ft)
Max Span
14 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
4,914
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,178,000
Total Project Cost
$1,768,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.