HWY SALEM ST over RR MBTA/BMRR

.1MI E ST 28 · County 009, Massachusetts · Built 1928 · 2 Lanes · 12,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
L0402432EDOT634
Year Built
1928
Reconstructed
1997
Length
44.5 m (146 ft)
Max Span
43.6 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
12,600
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,904,000
Total Project Cost
$10,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.