HWY SALEM ST over RR MBTA/BMRR
.1MI E ST 28 · County 009, Massachusetts · Built 1928 · 2 Lanes · 12,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.697444, -71.161775
This bridge is in worse condition than 83.6% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 98 years old.
Nearby Bridges
ST 28 S BROADWAY over WATER SOUTH CANAL
Built 1939
ST 28 BROADWAY over WATER MERRIMACK RIVER
Built 1935
ST 28 BROADWAY over WATER NORTH CANAL
Built 1939
HWY AMESBURY ST over COMB MERIMAC RIV/ACCESS
Built 1918
HWY S UNION ST over RR MBTA/BMRR
Built 1927
HWY AMESBURY ST over WATER NORTH CANAL
Built 1919
HWY AMESBURY ST over WATER SOUTH CANAL
Built 1918
HWY ACCESS RD over WATER NORTH CANAL
Built 2003
HWY UNION ST over WATER MERRIMACK RIVER
Built 1888
HWY UNION ST over WATER NORTH CANAL
Built 1860
Bridge Details
- Structure #
- L0402432EDOT634
- Year Built
- 1928
- Reconstructed
- 1997
- Length
- 44.5 m (146 ft)
- Max Span
- 43.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 12,600
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,904,000
- Total Project Cost
- $10,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.