ST 28 BROADWAY over WATER NORTH CANAL

.16 KM N MERRIMAC RIVER · County 009, Massachusetts · Built 1939 · 3 Lanes · 14,432 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L040062YJDOTNBI
Year Built
1939
Length
30.8 m (101 ft)
Max Span
22.3 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
14,432
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,361,000
Total Project Cost
$8,042,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.