HWY GREEN ST over WATER IPSWICH RIVER

.48 KM NE. OF RT. 1A · County 009, Massachusetts · Built 1894 · 2 Lanes · 1,800 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
I010012R6MUNNBI
Year Built
1894
Reconstructed
1996
Length
31.1 m (102 ft)
Max Span
14.3 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
1,800
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,265,000
Total Project Cost
$3,398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.