HWY E BRIMFLD RD over WATER QUINEBAUG RIVER

2.3 MI S OF RTE 20 · County 013, Massachusetts · Built 1959 · 2 Lanes · 605 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
H1900315QMUNNBI
Year Built
1959
Length
12.5 m (41 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
605
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,169,000
Total Project Cost
$1,754,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.