HWY E BRMFLD RD over WATER QUINEBAUG RIVER

0.2 M S OF US 20 · County 013, Massachusetts · Built 1958 · 2 Lanes · 1,422 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B2400115LMUNNBI
Year Built
1958
Length
19.1 m (62.7 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
1,422
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,084,000
Total Project Cost
$3,127,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.