ST 8 MAIN ST over WATER E BR HOUSATONIC R

@ INT W/ VERGE ROAD · County 003, Massachusetts · Built 1924 · 2 Lanes · 3,215 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H160150BJDOTNBI
Year Built
1924
Length
11.6 m (38.1 ft)
Max Span
10.4 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
3,215
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$826,000
Total Project Cost
$1,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.