HWY EAST MAIN ST over WATER MERRIMACK RIVER

AT WEST NEWBURY MERRIMAC · County 009, Massachusetts · Built 1883 · 2 Lanes · 8,534 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
H12020311DOTNBI
Year Built
1883
Reconstructed
2013
Length
247.5 m (812 ft)
Max Span
58.5 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
8,534
Material
Steel
Design
Movable - Swing
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$28,254,000
Total Project Cost
$42,382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.