I 495 NB over HWY MIDDLE RD

2.3 MI S EXIT 54 · County 009, Massachusetts · Built 1964 · 3 Lanes · 40,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
A070212W9DOTNBI
Year Built
1964
Length
40.8 m (133.9 ft)
Max Span
18.3 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
40,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,962,000
Total Project Cost
$13,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.