HWY LITTLETON RD over ST 2

1.5 MI E OF RT 110 · County 027, Massachusetts · Built 1950 · 2 Lanes · 1,083 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
H090131LQDOTNBI
Year Built
1950
Reconstructed
1990
Length
57.9 m (190 ft)
Max Span
29 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,083
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,180,000
Total Project Cost
$6,271,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.