ST 2 over WATER BENNETTS BROOK

200 FT. W. OF 110.8 MM · County 027, Massachusetts · Built 1949 · 4 Lanes · 48,577 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
H090091PCDOTNBI
Year Built
1949
Length
6.8 m (22.3 ft)
Max Span
6.8 m
Lanes
4
Daily Traffic
48,577
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,067,000
Total Project Cost
$1,601,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.