HWY CHAPIN RD over WATER SCANTIC RIVER

0.1M S OF MAIN ST@TWNHALL · County 013, Massachusetts · Built 1956 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H040030QKMUNNBI
Year Built
1956
Reconstructed
2009
Length
19.4 m (63.6 ft)
Max Span
18.1 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,060,000
Total Project Cost
$1,591,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.