ROUTE 83 over SCANTIC RIVER

0.1 MI SOUTH OF MASS S.L. · County 013, Connecticut · Built 1927 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01148
Year Built
1927
Length
10.4 m (34.1 ft)
Max Span
8.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
2,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.