ST 57 MAIN RD over WATER HUBBARDS RIVER

AT TOLLAND TOWN LINE · County 013, Massachusetts · Built 1956 · 2 Lanes · 1,034 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
G100090D2DOTNBI
Year Built
1956
Length
12.8 m (42 ft)
Max Span
11.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,034
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$871,000
Total Project Cost
$1,307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.