HWY W HARTLND RD over WATER HUBBARD RIVER

1 MI SOUTH OF ROUTE 57 · County 013, Massachusetts · Built 1939 · 2 Lanes · 258 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
G100010HKMUNNBI
Year Built
1939
Reconstructed
1997
Length
10.2 m (33.5 ft)
Max Span
9.1 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
258
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$763,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.