I 90 WB over HWY ADAMS RD

100.9 MM OF RT 90 · County 027, Massachusetts · Built 1957 · 3 Lanes · 40,939 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G080334LADOTNBI
Year Built
1957
Reconstructed
1988
Length
13.1 m (43 ft)
Max Span
11.6 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
40,939
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,564,000
Total Project Cost
$2,347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.