HWY FOREST ST over WATER DIX BROOK

@ INST. OF ROBIN HOOD LN · County 021, Massachusetts · Built 1989 · 2 Lanes · 1,900 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
F080167WJMUNNBI
Year Built
1989
Length
6.5 m (21.3 ft)
Max Span
3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,900
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$379,000
Total Project Cost
$569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.