ST140 E CENTRAL ST over RR MBTA/CSX

0.1 MI WEST OF SUMMER ST · County 021, Massachusetts · Built 1899 · 4 Lanes · 19,237 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F080072B0DOT634
Year Built
1899
Reconstructed
1995
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
35.7 m (117.1 ft)
Lanes
4
Daily Traffic
19,237
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,086,000
Total Project Cost
$3,130,000