HWY JUG END RD over WATER KARNER BROOK

AT INT W/MT.WASHINGTON RD · County 003, Massachusetts · Built 1956 · 2 Lanes · 647 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E08006049MUNNBI
Year Built
1956
Length
7.5 m (24.6 ft)
Max Span
6.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
647
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.