HWY BUTTON BALL over WATER HUBBARD BROOK

450 S. OF INT. W/ RTE 23 · County 003, Massachusetts · Built 1956 · 2 Lanes · 259 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E0800304CMUNNBI
Year Built
1956
Length
10.1 m (33.1 ft)
Max Span
9.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
259
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$326,000
Total Project Cost
$490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.