I 91 NB over OTHER MANHAN RAIL TRAIL

MM 21.2 ON I-91 NB · County 015, Massachusetts · Built 1963 · 2 Lanes · 27,714 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
E050250XADOTNBI
Year Built
1963
Length
62.8 m (206 ft)
Max Span
20.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
27,714
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,522,000
Total Project Cost
$8,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.