I 91 SB over OTHER MANHAN RAIL TRAIL

MM 21.2 ON I-91 SB · County 015, Massachusetts · Built 1963 · 2 Lanes · 27,526 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
E050250X9DOTNBI
Year Built
1963
Length
55.4 m (181.8 ft)
Max Span
17.9 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
27,526
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,908,000
Total Project Cost
$7,363,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.