HWY N MAIN ST over WATER FRENCH RIVER

AT CEMETERY RD · County 027, Massachusetts · Built 1993 · 2 Lanes · 4,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D120201FFMUNNBI
Year Built
1993
Length
25 m (82 ft)
Max Span
22.6 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,985,000
Total Project Cost
$2,978,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.