ST 12 MAIN ST over WATER FRENCH RIVER

AT WEBSTER-DUDLEY T.L. · County 027, Massachusetts · Built 1868 · 2 Lanes · 12,630 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D120061YRDOTNBI
Year Built
1868
Reconstructed
1956
Length
17.7 m (58.1 ft)
Max Span
12.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
12,630
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$281,000
Total Project Cost
$422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.