ST 9 /ST112 over WATER N BR SWIFT RIVER

100 W JCT SWIFT RIV RD. · County 015, Massachusetts · Built 1950 · 2 Lanes · 2,614 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C210100JHDOTNBI
Year Built
1950
Reconstructed
1986
Length
14.3 m (46.9 ft)
Max Span
12.7 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
2,614
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,374,000
Total Project Cost
$2,062,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.