ST143 MAIN RD over WATER WESTFIELD RIVER

JCT IRELAND ST. · County 015, Massachusetts · Built 1947 · 2 Lanes · 1,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C120050JYDOTNBI
Year Built
1947
Length
52.1 m (170.9 ft)
Max Span
23.9 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
1,150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,095,000
Total Project Cost
$6,143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.