ST116 S DEERFLD RD over WATER SOUTH RIVER

.4 M NORTH OF CONWAY CTR. · County 011, Massachusetts · Built 1925 · 2 Lanes · 2,633 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C200110K7DOTNBI
Year Built
1925
Length
13.7 m (44.9 ft)
Max Span
12.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,633
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$964,000
Total Project Cost
$1,447,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.