HWY N POLAND RD over WATER POLAND BROOK

0.1 MI. S. OF ROUTE 116 · County 011, Massachusetts · Built 1940 · 1 Lanes · 776 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
2
Critical
Substructure
5
Fair

Bridge Details

Structure #
C200040F1MUNNBI
Year Built
1940
Length
21.3 m (69.9 ft)
Max Span
7 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
776
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,428,000
Total Project Cost
$5,143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.