HWY BURTON HLL R over WATER SOUTH RIVER

350 E. OF INT W/ RTE 116 · County 011, Massachusetts · Built 1939 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A130250FJMUNNBI
Year Built
1939
Length
7.9 m (25.9 ft)
Max Span
6.1 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
120
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$761,000
Total Project Cost
$1,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.