HWY BISBEE RD over WATER PAGE BROOK

100 SOUTH OF RTE 143 · County 015, Massachusetts · Built 1960 · 2 Lanes · 905 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
C120020G9MUNNBI
Year Built
1960
Length
10.2 m (33.5 ft)
Max Span
9.8 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
905
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$436,000
Total Project Cost
$655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.