US 20 HUNTINGTN RD over RR BARR (ABANDONED)

.4 MI EAST OF MAPLE ST · County 013, Massachusetts · Built 1929 · 2 Lanes · 8,280 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C110350AUDOTNBI
Year Built
1929
Length
14.4 m (47.2 ft)
Max Span
12.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
8,280
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,325,000
Total Project Cost
$1,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.