HWY MAPLE ST over WATER W BR WESTFIELD RIV

JUST NORTH OF ROUTE 20 · County 013, Massachusetts · Built 1900 · 1 Lanes · 143 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C1101303PMUNNBI
Year Built
1900
Reconstructed
2010
Length
36.6 m (120.1 ft)
Max Span
35.4 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
143
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,459,000
Total Project Cost
$5,189,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.