US 3 over WATER RIVER MEADOW BRK

0.25 MI S RT 3 & RT 110 · County 017, Massachusetts · Built 1959 · 12 Lanes · 126,338 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
C080352G4DOTNBI
Year Built
1959
Reconstructed
2004
Length
12.8 m (42 ft)
Max Span
3.7 m
Lanes
12
Daily Traffic
126,338
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,859,000
Total Project Cost
$7,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.