US 3 NB over ST110 CHELMSFORD ST

0.8 KM N OF I 495 · County 017, Massachusetts · Built 2004 · 3 Lanes · 27,931 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C080129TJDOTNBI
Year Built
2004
Length
30.1 m (98.8 ft)
Max Span
28.4 m
Width
23 m (75.5 ft)
Lanes
3
Daily Traffic
27,931
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,222,000
Total Project Cost
$3,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.