ST 27 CRESCENT ST over WATER TROUT BROOK

0.6 M E OF RTE 28 · County 023, Massachusetts · Built 1976 · 4 Lanes · 16,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B2503549LDOTNBI
Year Built
1976
Length
7.3 m (24 ft)
Max Span
6.4 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
16,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$861,000
Total Project Cost
$1,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.