HWY BNNINGTN ST over TR BLUE LINE

OVER BLUE LINE · County 025, Massachusetts · Built 1961 · 4 Lanes · 17,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B162154VUMBTNBI
Year Built
1961
Reconstructed
2010
Length
46.1 m (151.2 ft)
Max Span
29 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
17,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$7,446,000
Total Project Cost
$11,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.