HWY HARVARD ST over RR MBTA

.33 MI W OF SR28 · County 025, Massachusetts · Built 1904 · 2 Lanes · 8,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B161593HCDOT634
Year Built
1904
Reconstructed
1996
Length
20.7 m (67.9 ft)
Max Span
19.8 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
8,500
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,309,000
Total Project Cost
$1,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.