HWY SOUTH ST over WATER NORTH BROOK

.85 MI NW OF WHITNEY ST · County 027, Massachusetts · Built 1900 · 2 Lanes · 1,422 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B090031E8MUNNBI
Year Built
1900
Reconstructed
1952
Length
8.2 m (26.9 ft)
Max Span
7 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
1,422
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$445,000
Total Project Cost
$668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.